Avoiding such waste requires leveling out the workload, also known as heijunka
— Flow Engineering, in “10 Principles of Flow Engineering”, Steve Pereira & Andrew Davis
1 of our books defines this term.
Avoiding such waste requires leveling out the workload, also known as heijunka
— Flow Engineering, in “10 Principles of Flow Engineering”, Steve Pereira & Andrew Davis
See also Conflicting Priorities · Constraint · Cycle Time · Flow Efficiency · Flow Engineering · Neglected Work
Filed under Flow & Lean